Marina Construction

Our work is on display at several marinas; we recently performed full renovations of two local marinas. We have expertise in all aspects of marina construction, including navigating the permitting process, coordinating with conservation commissions and environmental agencies, and as-needed dredging and disposal.

Contact Us

FEATURED PROJECTS

Parker's Boatyard Travel Lift Pad

Drove pilings to support concrete slab under travel lift pad.

Learn More

Fiddlers Cove Marina Maintenance

Installed float pile replacements.

Learn More

East Marine Travel Lift Construction

For the travel lift pier at this Falmouth Harbor institution, we installed composite bulkhead, drove approximately 65 piles, and poured concrete for a new travel lift dock.

Learn More

Mashpee Neck Marina Construction

Prior to 2020, only approximately 1/3 of this marina was accessible by water. The first part of this project required dredging 16,000yds to make the rest of the marina navigable. We drove approximately 80 pilings to secure floating docks and installed the floats. The marina was able to triple the number of slips available.

Learn More

East Falmouth Marina Construction

At this landmark marina in East Falmouth, we installed 700 linear feet of composite sheathing, built and placed a tieback system, drove 50 float pilings, and launched the floating docks.

Learn More

Ready to Start Your Marine Construction Project?

Expert Consultation: Schedule a consultation with our marine construction experts to discuss your project needs.

Quality Assurance: Our projects are backed by a quality guarantee, ensuring durable and reliable results tailored to withstand marine conditions.

Timely Execution: With a proven track record of on-time and on-budget project completion, we ensure your marine construction project is delivered efficiently and professionally.